Work & studies in progress

DRINKING WATER

A multi-year programme has been drawn up to renovate drinking water networks (2014-2019, 300,000 € per year).

Messanges
Reinforcement of Route de la Plage north

Vieux Boucau
Boulevard du Marensin, Rue de Port d’Albret
Renovation of water tower pipe-work, Vieux Boucau.

Association
Evaluation of 2 boreholes: water tower and F2 borehole, Vieux Boucau
Replacement of borehole equipment cabinets
Upgrading of valve boxes (approximately 100)
Renewal of 750 meters per year

SANITATION

Azur
Creation of the collective sanitation network for the PESSON district (TC2)
Le Moulin pumping station: upflow and H2S treatment

Messanges
Creation of the collective sanitation network for the MOUTIC district (TC2)
Creation of the collective sanitation network for the BARRAILS district (1st phase)
Renovation as part of the evaluation: smoke tests, televised video inspection

Soustons
Costemale sanitation network: Topographies and studies
Doubling of the trap – Baquet fountain (study and regulatory file)
Geotechnical study, Rue du Vicomte

Vieux Boucau
Renovation of the sanitation network on the mall (lakeside)
Renovation as part of the evaluation: smoke tests, televised video inspection

Association
Diagnostic study and outline plan for the 4 communes (end of the study)
Upgrade electrical installations to comply with standards
Change of remote management equipment (modernization and move to GSM)
Renovation of the buffer tank
Diagnostic study of the civil engineering for the sewage treatment plant
Sewage treatment plant: change the inclined plate on clarifier no. 2 and adjust the storm spillway on the lagoon
Repairs to the compost maturing ventilation system following flood damage in June 2013.
Upgrade restrictors
Purchase a camera for network pre-diagnosis

STUDIES IN PROGRESS

Sanitation and drinking water evaluations.

This diagnostic study of SANITATION should enable us to:
- draw up an evaluation of the condition of the wastewater drainage networks
- gain a clear idea of the impact on receiving environments of installation malfunctions in dry and wet weather
- plan the future development of sanitation structures to meet the Association’s current and future needs
- draw up a coherent multi-year investment programme prioritized according to effectiveness in protecting the natural environment, as expressed by objective indicators
- draw up rules for the technical management of the networks with a view to optimizing their operation.
 
The study will be carried out in 5 phases as follows:
- Phase 1: Collect data and analyze the existing system
- Phase 2: Evaluate the collection system operation
- Phase 3: Carry out further investigations
- Phase 4: Technical and financial study of the various possible sanitation scenarios and programme of works
- Phase 5: Update the outline plan for sanitation in the 4 communes

The diagnostic study of DRINKING WATER should enable us to meet the following objectives:
- Draw up an inventory of the drinking water treatment and distribution system;
- Draw up an evaluation of the operation of the current drinking water network and use the PORTEAU software package to model the network
- Evaluate the commune’s future supplies and needs;
- Draw up a costed, prioritized programme of works to improve the current situation and incorporate developments within the commune.

The study will be carried out in 5 phases as follows:
- Phase 1: Collect data and analyze the existing system,
- Phase 2: Measurement campaign - Sectorization
- Phase 3: Network modelling
- Phase 4: Treatment plant evaluation
- Phase 5: Draw up the outline plan for drinking water